Home / Jobs / Heat pump and air conditioning installers
Jobs for heat pump and AC installers
Concrete scanning for heat pump and air conditioning installers
One hole usually carries the whole system: refrigerant lines, condensate and the interconnecting cable, from an indoor unit high on the wall to the outdoor unit outside. Add the bracket anchors for the outdoor unit, or a flue hole for a boiler swap, and one job puts several holes into a wall that may carry cables, pipes and bars.
Before you drill for a heat pump or AC
Stop and call a structural engineer if
- the hole would go through a beam or a column
- you are unsure whether the wall can carry the unit
The short version of this page. The details and sources follow below.
From Concrete scanning for heat pump and air conditioning installers: drillclear.com/jobs/heat-pump-and-air-conditioning-installers, where every step has its sources.
- US
- mini split, line set, condensate line, condenser, wall bracket, core
- UK
- split AC, pipe run, outdoor unit bracket, flue, diamond core, breeze block
- India
- split AC, core cutting, RCC wall, copper piping, outdoor unit stand

The jobs
01The line set hole
Sloping down to the outside, sized by the unit's manual. Scan a grid around it, both faces if you can reach them: the bit comes out the other side.
02Outdoor unit brackets
Anchors into an outside wall that has to carry the unit, as many as the bracket asks for. Scan each anchor line and keep clear of bars and conduits.
03A flue or pipe hole
A boiler flue core (125 mm in one manual) is bigger than a 65 mm line set hole, and a bigger core needs a bigger clear window.
Try the job in 3D
The lab's core goes through a 200 mm slab with top and bottom mats; a line set or flue core through a wall is the same check standing up. Scan two lines along and two across, pick the core size nearest your hole, and drag the circle: red on a mark, green when clear by 30 mm in this model.
One situation from the Scan lab, which has all eleven.
How pros do it
- Take the hole size and slope from the manual. Daikin asks for a 65 mm hole sloping down towards the outside1. Mitsubishi Electric asks for 65 mm with the outdoor side 5 to 7 mm lower than the indoor side2. A UK installer guide says holes are typically around 65 or 70 mm, drilled from one side until the centre pilot drill appears on the other, then finished from that side3. A boiler flue can go the other way: Worcester Bosch has it rise to the outside at 3°4.
- Check the wall carries the unit. Daikin asks you to check that the wall or floor is strong enough for the weight of the unit1. A bracket maker says to consult a structural engineer if you are unsure of the wall's load bearing capacity, and to keep brackets off the outside walls of living areas or bedrooms because of structure-borne noise5.
- Keep out of beams and columns. On an Indian homeowners' forum, the usual advice is not to core through a concrete beam for split AC pipes6.
From the trade sources listed below, opened 17 November 2026. They describe professional practice in general, not Eagle XR.


This side goes flat on the surface.
Where Eagle XR fits
- For use before every hole, core or cut in concrete walls, slabs and columns7. At 100 by 90 mm, the sensor is made to fit in tight corners7.
- It lists electric cables and conduits, water pipes including non-metallic PEX and PVC, and rebar, each at its depth8, on concrete (dry, normal or wet), drywall, and masonry (brick and block) in the App Store listing8; the product page says Eagle Intelligence is trained on concrete and learning more materials7.
- It shows the back of the element7, which helps you judge the wall thickness for the bit length. The accuracy of that depth has not been published: confirm the thickness before you rely on it.
- It scans one line at a time, in one direction: you slide it forward along the line, lift it, and start the next line.
Where it does not
- Whether a beam or column may be cored is the engineer's decision, not a scan result.
- Insulated cavity walls, render, external cladding and tiles are not addressed in Screening Eagle's published facts.
- Screening Eagle has not published whether it tells you a cable is live. Treat every cable as live: isolate and prove dead before you drill near one.
- Eagle XR is not a GPR: Screening Eagle calls it a first look for everyday work, to see whether a spot is clear or whether to call an expert. For investigations, mapping and reports, it points professionals to GPR systems7.
Questions heat pump and AC installers ask
What size core drill for air conditioning?Manufacturer manuals
Use the size in your unit's manual. The two we read ask for 65 mm12; bigger systems and other models can differ.
How do I run mini split lines through a wall?Manuals, installer guide
Through one sleeved hole that slopes down to the outside, so condensate drains out. The installer guide says to line the hole against dust and debris from the wall, and not to fix the pipes permanently in the sleeve before the system is tested3. In a wall with a metal frame or board, Daikin requires a wall embedded pipe "to prevent possible heat, electrical shock, or fire"1.
Mini split installation: drilling through a concrete wallInstaller guide, forum
In the sources we read, thick reinforced concrete takes a diamond core, and brick or block a hole saw. One installer guide uses carbide-tipped hole saws with an SDS plus drill for brick and breeze block3. In a forum thread, an installer said a simple hammer drill does not suit thick RCC walls, and a diamond-tipped core drill is described6. Either way, move the hole before you move the bar.
Is core cutting safe for AC installation?NICEIC, manual
Through a wall it is common installer work, but a scan alone does not make it safe. Check the structure, the services and your drilling precautions too. UK wiring rules, as NICEIC summarised the 2008 edition of BS 7671, let hidden cables run within 150 mm of the top of the wall and within 150 mm of a corner where two walls meet9. Indoor units go at least 1.8 m from the floor in Daikin's manual1, often close to the ceiling or a corner: right where those cables may run.
What size is a boiler flue hole?Worcester Bosch manual
It depends on the boiler, so use its manual. For the Worcester Greenstar 25Si/30Si, a 100 mm flue needs a 125 mm hole, or 150 mm if you push the weather sealing collar through from inside, drilled with a core drill or similar4.
What hole does a heat pump need in the wall?General
A split heat pump runs refrigerant lines like a mini split, so it needs the same kind of hole. An air-to-water monobloc runs water pipes, so the size depends on the pipes and insulation in your design: use the manual and the design.
Can the outdoor unit hang on a concrete or block wall?Bracket manual, installer guide
Yes, if the wall can carry it. Stiebel Eltron's WK 2 bracket is rated for 175 kg, and the maker warns: "If the load bearing capacity of the wall cannot be guaranteed, do not use the wall mounting bracket"5. An installer guide says to level the arms in both directions to help reduce vibration10.
Anything else: search every answer on this site on Before you buy, or ask Screening Eagle directly.
Ready for your own job?
CHF 3,950per scanner, excluding VAT, import taxes and delivery. Ordering happens on Screening Eagle's shop.
Buy in Solar GoldPartner link: we may earn a commission. You pay Screening Eagle's normal price.
- Sold and shipped by Screening Eagle
- Same price in all four finishes
- Card, Apple Pay or Google Pay
- Express shipping from Switzerland. US orders ship from Pennsylvania
Sources
- Daikin, room air conditioner installation manual FTXTA (3PEN769578-10L), read 17 November 2026, daikin.eu
- Mitsubishi Electric Australia, MSZ-LN VG2 installation manual (2020), read 17 November 2026, mitsubishielectric.com.au
- Checkmark, The hole in the wall for the refrigerant lines (installation guide), read 17 November 2026, check-mark.co.uk
- Worcester Bosch, Greenstar 25Si/30Si installation, commissioning and servicing instructions, read 17 November 2026, worcester-bosch.ie
- Stiebel Eltron USA, WK 2 wall mounting support for outdoor heat pump units, installation instructions, read 17 November 2026, stiebel-eltron-usa.com
- NoBroker forum, What is Core Cutting in AC Installation (answers 2026), read 17 November 2026, nobroker.in
- Screening Eagle, Eagle XR product page and FAQ, read 15 November 2026, xr.screeningeagle.com
- Apple App Store, Eagle XR listing by Screening Eagle Technologies AG, read 15 November 2026, apps.apple.com
- NICEIC, Cables concealed in walls or partitions: protection against penetration (BS 7671:2008 article), read 17 November 2026, tlc-direct.co.uk
- Checkmark, Outside unit: installation requirements, read 17 November 2026, check-mark.co.uk